3.39MW Distributed BAPV Project

3.39MW

Anhui Huamao Soft Packaging Co., Ltd. is a specialized enterprise engaged in the design, printing, and processing of plastic flexible packaging. We are proud to serve as the EPC contractor for this remarkable photovoltaic (PV) project.

Project Highlights:

Total Installed Capacity: 3.39MW, constructed in two phases.
Phase 1: 0.75MW
Phase 2: 2.64MW
Installation Method: BAPV (Building-Applied Photovoltaics) technology was used, with PV modules seamlessly integrated onto the color steel tile roofs. This not only reduces electricity costs for the owner but also adds an extra layer of protection to the roof.

From design to grid connection, Phase 2 was completed in just 2 months. The project operates on a self-consumption model with surplus power fed into the grid, achieving an impressive annual average power generation of 2.7 million kWh.